Skip to Main Content
Loading
Loading
I Want To...
Services
Departments
Home
FAQs
Search
All categories
Animal Care & Control - Found Pet
Animal Care & Control - Licensing
Animal Care & Control - Lost Pet
Animal Care & Control - Pet Adoption
Animal Care & Control - Pet Care Services
Animal Care & Control - Recurring Donations
Animal Care & Control - Services & Fees
Animal Care & Control - Shelter Plans
Cave Creek Landfill
Community Emergency Notification System
Constables - Frequently Asked Questions
Correctional Health Services
Correctional Health Services - Work With Us
County Improvement Districts
COVID-19 Vaccine Vendor Frequently Asked Questions
Dental Sealant Program
Dependency Court - Appeals
Dietetic Internship Full-Time Track
Dietetic Internship Tracks
Dietetic Internship WIC Track
Disinterment / Reinterment Permit
Emergency Management Preparedness and Response
Family Support
Fentanyl Resources
Fetal Death Certificates
Fetal Death Permit
Flood Control - Flood Insurance
Flood Control - Flood Insurance (Español)
Flood Control - Floodplains
Flood Control - Floodplains (Español)
Flood Control - General
Flood Control - General (Español)
Flood Control - Permits
Flood Control - Permits (Español)
Flood Control - Projects & Studies
Flood Control - Projects & Studies (Español)
Flood Control - Property & Maintenance
Flood Control - Property & Maintenance (Español)
Flood Control - Rainfall & Weather
Flood Control - Rainfall & Weather (Español)
Flood Control - Storm Assistance
Flood Control - Storm Assistance (Español)
HIV
HSD - CCRA Responses to Landlords
Human Services - Education / Head Start
Immunizations
Información sobre la clínica - Preguntas más frecuentes
Initiating a Remote Attestation
Internal Audit
Juvenile Court - Delinquency FAQs
Juvenile Court - Mental Competency
La Gripe - Preguntas Comunes
Maricopa County Lead Safe Phoenix Partnership
MCDOT
MCDOT - Permits
MCDOT Contracts
MCDOT Plat Index
MCDOT Roads
Medical Benefit Options
Non-Contagious Disease Letter
Office of the Medical Examiner FAQs
Onsite Wastewater Systems
Palo Verde Nuclear Generating Station
Planning & Development - Agricultural Exemption
Planning & Development - Commercial
Planning & Development - Community Residences / Recovery Community
Planning & Development - Compliance / Special Inspection
Planning & Development - Drainage
Planning & Development - Home Occupation
Planning & Development - Legal Non-Conforming
Planning & Development - Manufactured Housing
Planning & Development - Permits
Planning & Development - Plan of Development
Planning & Development - Property History
Planning & Development - Property Research
Planning & Development - Residential
Planning & Development - Temporary Power
Planning & Development - Temporary Use
Planning & Development - Variance Cases / Meetings
Planning & Development - Variance Requests
Planning & Development – Inspections
Procurement Services
Public Advocate
Public Advocate - Restoration of Rights
Public Defender
Public Defender - Courts & Case
Public Defender - Non-Criminal Matters
Public Defender - Office FAQ
Public Defender - Restoration of Rights
Public Fiduciary - Burial Information
Public Fiduciary - GUARDIANSHIP AND/OR CONSERVATORSHIP
Public Health - Birth Certificate Eligibility
Public Health - Birth Certificates
Public Health - Death Certificate Eligibility
Public Health - Death Certificates
Public Health - Flu FAQ
Queen Creek Landfill
Rabies
Real Estate
Solid Waste
Solid Waste - Bio-Hazardous Medical Waste Transportation
Solid Waste - Chemical Toilets, Portable Restroom Units & Portable Waste Holding Tanks
Solid Waste - Construction & Debris Landfills
Solid Waste - Non-Hazardous Liquid Waste (NHLW) Transportation
Solid Waste - Non-Hazardous Liquid Waste Transfer Facilities
Solid Waste - Non-Hazardous Solid Waste (NHSW) Transportation
Solid Waste - Refuse Containers
STD Clinic
Stormwater Quality Program
Subdivision & Infrastructure - Approvals
Subdivision & Infrastructure - Documentation
Subdivision & Infrastructure - Engineering Design
Subdivision & Infrastructure - Engineering Design - Reclaimed Water Facilities & Systems
Subdivision & Infrastructure - Engineering Design - Wastewater Facilities & Systems
Subdivision & Infrastructure - Engineering Design - Water Facilities & Systems
Subdivision & Infrastructure - Projects
Swimming Pools Management - Approvals
Swimming Pools Management - Construction
Swimming Pools Management - Design
Swimming Pools Management - General
Swimming Pools Management - Operating Permits
Swimming Pools Management - Operations & Maintenance
Swimming Pools Management - Projects
Swimming Pools Management - Variances
TB Control & Prevention
Vector Control - Roof Rats
Vector Control - West Nile Virus
Waste Resources - Disposals
Waste Resources - Operations
Water & Waste Management
Water & Waste Management: Approvals
Water & Waste Management: Documentation
Water & Waste Management: Drinking Water Approvals and Permits
Water & Waste Management: Drinking Water General
Water & Waste Management: Drinking Water Quality
Water & Waste Management: Engineering Design
Water & Waste Management: Engineering Design - Reclaimed Water Facilities & Systems Engineering Design
Water & Waste Management: Engineering Design - Wastewater Treatment Facilities & Systems Engineering Design
Water & Waste Management: Engineering Design - Water Treatment Facilities & Systems Engineering Design
Water & Waste Management: MAG 208 Certification
Water & Waste Management: Operating Permits
Water & Waste Management: Operations & Maintenance
Water & Waste Management: Projects
Women Infants & Children (WIC)
Categories
All Categories
Animal Care & Control - Found Pet
Animal Care & Control - Licensing
Animal Care & Control - Lost Pet
Animal Care & Control - Pet Adoption
Animal Care & Control - Pet Care Services
Animal Care & Control - Recurring Donations
Animal Care & Control - Services & Fees
Animal Care & Control - Shelter Plans
Cave Creek Landfill
Community Emergency Notification System
Constables - Frequently Asked Questions
Correctional Health Services
Correctional Health Services - Work With Us
County Improvement Districts
COVID-19 Vaccine Vendor Frequently Asked Questions
Dental Sealant Program
Dependency Court - Appeals
Dietetic Internship Full-Time Track
Dietetic Internship Tracks
Dietetic Internship WIC Track
Disinterment / Reinterment Permit
Emergency Management Preparedness and Response
Family Support
Fentanyl Resources
Fetal Death Certificates
Fetal Death Permit
Flood Control - Flood Insurance
Flood Control - Flood Insurance (Español)
Flood Control - Floodplains
Flood Control - Floodplains (Español)
Flood Control - General
Flood Control - General (Español)
Flood Control - Permits
Flood Control - Permits (Español)
Flood Control - Projects & Studies
Flood Control - Projects & Studies (Español)
Flood Control - Property & Maintenance
Flood Control - Property & Maintenance (Español)
Flood Control - Rainfall & Weather
Flood Control - Rainfall & Weather (Español)
Flood Control - Storm Assistance
Flood Control - Storm Assistance (Español)
HIV
HSD - CCRA Responses to Landlords
Human Services - Education / Head Start
Immunizations
Información sobre la clínica - Preguntas más frecuentes
Initiating a Remote Attestation
Internal Audit
Juvenile Court - Delinquency FAQs
Juvenile Court - Mental Competency
La Gripe - Preguntas Comunes
Maricopa County Lead Safe Phoenix Partnership
MCDOT
MCDOT - Permits
MCDOT Contracts
MCDOT Plat Index
MCDOT Roads
Medical Benefit Options
Non-Contagious Disease Letter
Office of the Medical Examiner FAQs
Onsite Wastewater Systems
Palo Verde Nuclear Generating Station
Planning & Development - Agricultural Exemption
Planning & Development - Commercial
Planning & Development - Community Residences / Recovery Community
Planning & Development - Compliance / Special Inspection
Planning & Development - Drainage
Planning & Development - Home Occupation
Planning & Development - Legal Non-Conforming
Planning & Development - Manufactured Housing
Planning & Development - Permits
Planning & Development - Plan of Development
Planning & Development - Property History
Planning & Development - Property Research
Planning & Development - Residential
Planning & Development - Temporary Power
Planning & Development - Temporary Use
Planning & Development - Variance Cases / Meetings
Planning & Development - Variance Requests
Planning & Development – Inspections
Procurement Services
Public Advocate
Public Advocate - Restoration of Rights
Public Defender
Public Defender - Courts & Case
Public Defender - Non-Criminal Matters
Public Defender - Office FAQ
Public Defender - Restoration of Rights
Public Fiduciary - Burial Information
Public Fiduciary - GUARDIANSHIP AND/OR CONSERVATORSHIP
Public Health - Birth Certificate Eligibility
Public Health - Birth Certificates
Public Health - Death Certificate Eligibility
Public Health - Death Certificates
Public Health - Flu FAQ
Queen Creek Landfill
Rabies
Real Estate
Solid Waste
Solid Waste - Bio-Hazardous Medical Waste Transportation
Solid Waste - Chemical Toilets, Portable Restroom Units & Portable Waste Holding Tanks
Solid Waste - Construction & Debris Landfills
Solid Waste - Non-Hazardous Liquid Waste (NHLW) Transportation
Solid Waste - Non-Hazardous Liquid Waste Transfer Facilities
Solid Waste - Non-Hazardous Solid Waste (NHSW) Transportation
Solid Waste - Refuse Containers
STD Clinic
Stormwater Quality Program
Subdivision & Infrastructure - Approvals
Subdivision & Infrastructure - Documentation
Subdivision & Infrastructure - Engineering Design
Subdivision & Infrastructure - Engineering Design - Reclaimed Water Facilities & Systems
Subdivision & Infrastructure - Engineering Design - Wastewater Facilities & Systems
Subdivision & Infrastructure - Engineering Design - Water Facilities & Systems
Subdivision & Infrastructure - Projects
Swimming Pools Management - Approvals
Swimming Pools Management - Construction
Swimming Pools Management - Design
Swimming Pools Management - General
Swimming Pools Management - Operating Permits
Swimming Pools Management - Operations & Maintenance
Swimming Pools Management - Projects
Swimming Pools Management - Variances
TB Control & Prevention
Vector Control - Roof Rats
Vector Control - West Nile Virus
Waste Resources - Disposals
Waste Resources - Operations
Water & Waste Management
Water & Waste Management: Approvals
Water & Waste Management: Documentation
Water & Waste Management: Drinking Water Approvals and Permits
Water & Waste Management: Drinking Water General
Water & Waste Management: Drinking Water Quality
Water & Waste Management: Engineering Design
Water & Waste Management: Engineering Design - Reclaimed Water Facilities & Systems Engineering Design
Water & Waste Management: Engineering Design - Wastewater Treatment Facilities & Systems Engineering Design
Water & Waste Management: Engineering Design - Water Treatment Facilities & Systems Engineering Design
Water & Waste Management: MAG 208 Certification
Water & Waste Management: Operating Permits
Water & Waste Management: Operations & Maintenance
Water & Waste Management: Projects
Women Infants & Children (WIC)
What are the criteria used for the review of submittals?
Review the criteria used for the
review of submittals
.
▼
Water & Waste Management: Documentation
Show All Answers
1.
What types of documentation are required to be submitted?
The type of documentation submitted to the Water and Wastewater Treatment Program for review and approval of a project will vary depending on the characteristics of a particular project and the type of approval that is required. Find typical documentation that may be required to be submitted for
project approval
.
2.
Are electronic (digital format) documentation submittals accepted?
At the present time electronic documentation submittals for the final set of as-built documentation are not accepted by the Water and Wastewater Treatment Program. This is due to the requirements of public records archiving, as established by the State of Arizona. However, electronic submittals for the preliminary set of documentation submitted for review and approval may be accepted depending on the digital format and content of the submittal. To determine if electronic submittals of documentation will be accepted for your particular project, please contact a Water and Wastewater Treatment Program
staff member
.
3.
Does the documentation submitted for my project become part of the 'public record'?
When a project is 100% complete (i.e. a final approval certificate has been issued) all of the project documentation submitted to the Water and Wastewater Treatment program becomes part of the public record and is available to the general public. The final documentation set for a completed project typically includes, but is not limited to, an Engineering Design Report, as-built design drawings, Technical Specifications, and an Operations and Maintenance Manual. For more information, please call 602-506-1069.
4.
My project contains proprietary or sensitive information. How can I protect this data?
The final documentation set for a completed project becomes part of the public record and is available to the general public. As defined by state law, public record documentation must be available for examination by the general public. However, the proprietary or sensitive information in question may not need to be submitted to obtain approval for your project unless that information is deemed as critical data for a proper review to be completed by the Water and Wastewater Treatment Program. If you wish to discuss this issue for your particular project, please contact a Water and Wastewater Treatment Program
staff member
.
5.
What types of documentation must be sealed by a Professional Engineer?
For projects with a construction value greater than $12,500, the following documentation, as a minimum, must be signed and stamped by a Professional Engineer:
- Design Drawings - Each Individual Design Drawing Sheet.
- Engineering Calculations and Design Data - As required by the Water and Wastewater Treatment Program or by the Arizona State Board of Technical Registration’s rules and regulations.
- Engineering Design Report - Cover, Table of Contents or First Page.
- Engineer’s Certificate Of Completion - As required on the certificate form.
- Operations and Maintenance Manual - Cover, Table of Contents or First Page.
- Reports and Other Documentation - As required by the Water and Wastewater Treatment Program or by the Arizona State Board of Technical Registration’s rules and regulations.
- Technical Specifications - Cover, Table of Contents or First Page.
If the project is a reuse water system, then the documentation may be stamped by a Professional Landscape Architect instead of a Professional Engineer. The Professional Engineer or Landscape Architect must be registered in the State of Arizona. The engineering or architectural firm must be registered with the Arizona State Board of Technical Registration.
If there are any questions about the rules and regulations related to sealing documentation, it is recommended that engineers or architects submitting documentation to the Water and Wastewater Treatment Program contact the
Arizona State Board of Technical Registration
.
6.
What format and how many copies of the documentation should be submitted?
If approved by the Water and Wastewater Treatment Program staff member performing the project review, reduced size drawings (for example, ANSI ‘C’ 12”H x 18”W drawings instead of ANSI ‘D’ 24”H x 36”W standard size drawings) may be submitted for the preliminary review and approval set of Design Drawings. However, if the level of detail on the drawings is very complex and is not discernable on smaller size drawings, then full size drawings should be submitted.
Normally only one copy of the documentation is required for the preliminary review. However, additional copies may be required if portions of the project are going to be reviewed by other MCESD programs.
The final as-built set of Design Drawings must be submitted as ANSI ‘D’ size 24”H x 36”W standard size drawings for the public record. All other documentation should be submitted in a binder and be 8-1/2”H x 11”W letter size sheets. For more information, please call 602-506-1069.
7.
What is the submission sequence for project documentation?
Review the submission sequence of documentation for a
typical project
.
8.
What are the criteria used for the review of submittals?
Review the criteria used for the
review of submittals
.
9.
Does the MCESD sign the cover page of the design drawings?
The cover page of the design drawings is signed by the Water and Wastewater Treatment Program staff for projects which involve the construction of or modification to a facility or system and require an Interim Approval to Construct, Approval to Construct or Approval to Decommission.
An approval area for the MCESD should be provided on the cover page with space reserved for the following information:
- Approval By: (Signature)
- Approval Date:
- Project Number:
For more information, please call 602-506-1069.
Live Edit
Arrow Left
Arrow Right
[]
Slideshow Left Arrow
Slideshow Right Arrow