Assessment Underway - Remediation to be DeterminedSTATUS AS OF 12/9/2022 - UNDER INVESTIGATION There are currently no remediation activities underway while the site is still under assessment and characterization to determine the most effective approach to remediation. Once appropriate actions are determined, details and progress will be posted here. New Well InstallationsMonitoring Wells
Installation of monitoring wells on the landfill property and at off-site locations is required to accurately characterize the site. The wells will provide additional sampling capacity for groundwater and soil vapor. The data collected from these wells will help in selecting the most effective remediation approach to address the contamination at the landfill. Use the links below to see a map of the locations and the drilling schedules. Map of Monitoring Well Locations (PDF) On-site Monitoring Well Drilling Schedule (PDF) - Started 12/29/2022, Completed 1/27/2023 Off-site Monitoring Well Drilling Timeline (PDF) - Started 3/20/2023 |